A contractor is set to replace the concrete on the Grand Junction Regional Airport's east apron, determined this time to ensure the work meets the specifications of the Federal Aviation Administration.
This is the second time in two years the apron is being replaced after the first attempt failed an FAA long-term strength test.
The apron is the area where aircraft park for boarding, deplaning and fueling. The east apron is located on the east side of the terminal.