The SYNTHEON ACCEL-E wall system, recently installed at the Birmingham-Shuttlesworth Airport, combines the strength and performance of cold-formed steel framing with the superior insulation properties of expanded polystyrene (EPS). It features an easy, one-step installation process and exceeds the new ASHRAE 2007 90.1 and IECC 2009 requirements for the building envelope.