At URETEK, we have rehabilitated over 50,000 miles of roadway, runways, tarmacs, and taxiways with UDI since 1989. UDI involves injection of structural polymer into base and subgrade...
Faulted joints on airport runways, taxiways, and aprons aren’t necessarily anyone’s fault. Sometimes it is simply a matter of time and moisture and the slow, steady movement of...