Georgia Completes Another Stage of Construction at Kutaisi Airport
Another stage of construction of a new passenger terminal at Georgia's Kutaisi International Airport has been completed, Trend reports via the press service of the United Airports of Georgia LLC.
As reported, the terminal terrace, facade, glass-fittings and roof were arranged. The new terminal has a so-called green roof and greened open terraces as well.
The works were carried out by Georgian Anagi LLC.
After the completion of the new terminal construction, the existing terminal will be repaired as well, after which both will be merged and the airport will have a common terminal, with flight and departure halls.
Upon completion of the construction of the new passenger terminal, the airport will have 7 exits (the so-called gate). Moreover, the airport will be increased by 4 times, and it will be able to serve 1,200 passengers per hour without interruption.
After the completion of the project, the total area of ??Kutaisi International Airport will be about 30,000 square meters.
Kutaisi International Airport served 181,675 passengers from January through March 2020, a 16-percent increase year-on-year.
---
Follow the author on Twitter: @Mila61979356
———
©2020 Trend News Agency (Baku, Azerbaijan)
Visit Trend News Agency (Baku, Azerbaijan) at en.trend.az
Distributed by Tribune Content Agency, LLC.